About Us

history-header

Timeline

  • Pribbenow Mine Sign

    1985: Drummond Ltd. was founded and acquired its first Colombian Coal Concession, which eventually became Pribbenow Mine.

  • Colombia Port

    1993-1995: Drummond Ltd. expanded operations into Colombia and began construction of a mine and port. The first international coal production occurred in 1995.

  • El Descanso Aerial

    1997: Drummond Ltd. acquired El Descanso mining concession, which included more than 1.7 billion tons of reserves.

  • 30 Million Tons

    2003: Drummond Ltd. acquired 3 new coal areas in Colombia: Rincon Hondo, Similoa, and Cerrolargo. (Total reserves acquired that year: 162 MM tons)

  • Oil and Gas

    2004-2005: Drummond Ltd. entered into Coal Bed Methane exploration in the Cesar basin: La Loma Contract and acquired the rights for Coal Bed Methane in association with Ecopetrol to explore the Guajira Block: Rio Rancheria.

  • Elza Dragline

    2009: Drummond Ltd. initiated the production phase for El Descanso Block.

  • Itochu Signing 01

    2011: ITOCHU Corporation became a 20% partner in Drummond Ltd.’s Colombian operations.

  • Direct Ship Loading System

    2014: On March 31, 2014 Drummond carried out its first shipment of coal using the direct ship loading system. With two shiploaders, Puerto Drummond now has an installed capacity of 60 million tons per year.

  • Garry Neil Drummond

    2016: On July 13, 2016 Garry Neil Drummond passed away. Mr. Drummond was Chairman and Chief Executive Officer of Drummond Company for over 40 years and was considered an iconic leader and entrepreneur in the coal and mining industry in the United States and South America.

  • Mike Tracy

    Today: Mr. Mike Tracy, former President of Mining, is named the new Chief Executive Officer of the company.

  • 1985: Drummond Ltd. was founded and acquired its first Colombian Coal Concession, which eventually became Pribbenow Mine.

  • 1993-1995: Drummond Ltd. expanded operations into Colombia and began construction of a mine and port. The first international coal production occurred in 1995.

  • 1997: Drummond Ltd. acquired El Descanso mining concession, which included more than 1.7 billion tons of reserves.

  • 2003: Drummond Ltd. acquired 3 new coal areas in Colombia: Rincon Hondo, Similoa, and Cerrolargo. (Total reserves acquired that year: 162 MM tons)

  • 2004-2005: Drummond Ltd. entered into Coal Bed Methane exploration in the Cesar basin: La Loma Contract and acquired the rights for Coal Bed Methane in association with Ecopetrol to explore the Guajira Block: Rio Rancheria.

  • 2009: Drummond Ltd. initiated the production phase for El Descanso Block.

  • 2011: ITOCHU Corporation became a 20% partner in Drummond Ltd.’s Colombian operations.

  • 2014: On March 31, 2014 Drummond carried out its first shipment of coal using the direct ship loading system. With two shiploaders, Puerto Drummond now has an installed capacity of 60 million tons per year.

  • 2016: On July 13, 2016 Garry Neil Drummond passed away. Mr. Drummond was Chairman and Chief Executive Officer of Drummond Company for over 40 years and was considered an iconic leader and entrepreneur in the coal and mining industry in the United States and South America.

  • Today: Mr. Mike Tracy, former President of Mining, is named the new Chief Executive Officer of the company.